Hoarding erection and site set up Strip out Complete soft strip Dismantling and strip out of cafeteria Dismantling and complete soft strip of shop floors scaffolding
Marks & SpencerHoarding erection and site set up Asbestos survey and strip Demolition and dismantling of all structure and basement Srip out Site preparation and enabling works Basement excavated and backfilled Scaffolding
Royal Hospital LiverpoolHoarding erection and site set up Asbestos survey and strip Strip out Complete soft strip removal of 40 tonne steel girders 5000 sq ft of concrete removed 7 floors striped out 4x 20 tonne boilers removed from basement 6000 tonne of hardcore removed Scaffolding
Primark LiverpoolPosition hording around site, to protect the public. Dismantle and remove all fittings in booking area. Remove seating and recycle were possible. Remove all wood panels and recycle. Strip out and demolish buiilding, Remove steel strutures and concrete plinths.
Odeon Liverpool