Primark Case Study

  • Hoarding erection and site set up
  • Strip out
  • Asbestos survey and strip
  • Complete soft strip
  • Removal of 40 tonne steel girders
  • Scaffolding
  • 5000 sq ft of concrete removed
  • 7 floors striped out
  • 4x 20 tonne boilers removed from basement
  • 6000 tonne of hardcore removed